Solar PV Farm Communication

Our current operation and communication connections on renewable sites for Waste Power, Solar PV and Wind Turbines is in access of 2.3 Gw throughout the UK.
A recent contract our engineers were commissioned to fusion splice fibre cores, connections of RS485 – MoDBus/CAMBUS and commission monitoring system on to a remote platform powered by satellite. The photovoltaic (PV) farm consisted of in excess of 150,000 PV solar panels that fed into 18 inverter stations linked via two fibre optic rings to enable remote monitoring of site.

In addition to the due to the distance of premier fence the park data supply to CCTV network was installed in multi mode fibre optic in order to prevent losses in signals.

As with all current renewable projects our engineers were faced with huge time constraints seeing our teams working through the night in order to achieve contract deadlines.

We offer a complete service to specify, supply and fit all the equipment required along with certification and as built drawings included.